Search
Close this search box.

Oliver Valvetek Supply on Short Lead-time to South America

8 Aug 2022  |
Oliver Valvetek distributes the first of two orders for its Subsea ¾” Actuated Gate Valves, earmarked for South America.

Our subsea gate valves are designed for operation at 15,000 PSI and have been specifically chosen for the project. We were able to work with the customer to meet a reduced lead-time for deployment on the first trees and EDP package, shipment of the second order of valves is expected at the end of October this year.

The deepwater field development plan involves production wells connected to a floating production storage and offloading (FPSO) unit. The FPSO will be permanently anchored to the seabed with a spread mooring system. The operational life of the FPSO is estimated to be a minimum of 25 years and will be one of the largest in the region. 

For more information on Subsea valves, contact Oliver Valvetek on +44 (0)1565 632 636 or email sales@valves.co.uk | www.valves.co.uk

Share this article

This article is published by

Oliver Valves Ltd, Oliver Valvetek Ltd and Oliver Twinsafe Ltd are world leaders in Instrumentation, Subsea and Pipeline valves, along with our newly established company for the hydrogen and carbon capture market, Oliver Hydcovalves Ltd....

Related Articles